{"id":3303,"date":"2015-03-30T09:48:01","date_gmt":"2015-03-30T14:48:01","guid":{"rendered":"http:\/\/www.poweradmin.com\/blog\/?p=3303"},"modified":"2015-05-21T16:15:46","modified_gmt":"2015-05-21T21:15:46","slug":"the-future-of-data-centres","status":"publish","type":"post","link":"https:\/\/www.poweradmin.com\/blog\/the-future-of-data-centres\/","title":{"rendered":"The Future of Data Centers"},"content":{"rendered":"<p><span style=\"font-family: verdana,geneva;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-3315\" src=\"\/blog\/wp-content\/uploads\/2015\/03\/the-future-of-data-centers-300x267.jpg\" alt=\"The Future of Data Centers\" width=\"300\" height=\"267\" srcset=\"https:\/\/www.poweradmin.com\/blog\/wp-content\/uploads\/2015\/03\/the-future-of-data-centers-300x267.jpg 300w, https:\/\/www.poweradmin.com\/blog\/wp-content\/uploads\/2015\/03\/the-future-of-data-centers.jpg 400w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\">Digital, green and global technologies will likely be the three basic drivers of future markets. Both green and global are dependent on digital, so it\u2019s worth considering what the path for digital may look like, in the coming years.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">The Emerson Network Power survey, \u201cData Center 2025: Exploring the Possibilities\u201d is an industry-wide initiative that raised key questions such as \u201cWhat are the data centers of the future?\u201d and \u201cWhat can we expect from the data center by 2025?\u201d<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">The <a title=\"Data Centers in 2025\" href=\"http:\/\/www.techradar.com\/news\/internet\/data-centre\/what-will-the-data-centre-of-2025-really-be-like--1268942\" target=\"_blank\" rel=\"nofollow\">survey<img class=\"extlink-icon\" src=\"https:\/\/www.poweradmin.com\/blog\/wp-content\/plugins\/external-links-nofollow-open-in-new-tab-favicon\/images\/extlink.png\"><\/a> includes opinions and contributions from over 800 industry professionals across three continents, such as InterXion, Forrester, IBM and EMC. Its key findings may be summarized as follows:<\/span><\/p>\n<h2><span style=\"font-size: 14pt; font-family: verdana,geneva; color: #339966;\"><b>Changing Energy Requirements<\/b><\/span><\/h2>\n<p><span style=\"font-family: verdana,geneva;\">Data centers are consistently expected to handle more capacity, deliver more availability, and use resources more effectively. The survey suggests that by 2025, due to more effective equipment, data centers will require much less energy to produce the same level of computing performance available today.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">Yet, the overall consumption of power by data centers may increase, regardless of those advances. Historically, the demand for digital services has always outstripped technology. A switch to new power sources seems likely.<\/span><\/p>\n<h2><span style=\"font-size: 14pt; font-family: verdana,geneva; color: #339966;\"><b>The Role of Renewables<\/b><\/span><\/h2>\n<p><span style=\"font-family: verdana,geneva;\">Survey respondents predict that by 2025, data centers will move away from fossil fuels and adopt renewable energy solutions \u2013 particularly solar.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">Solar power currently makes up 1% of the power generated in the US. By 2025, this figure could rise to 20%. But solar technology will need to evolve considerably in the next decade, if it\u2019s to prove viable.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">For example, a square-meter solar panel can currently generate about 600 kWh per year in Western Europe. So, to support power densities of a 6 kW\/rack (an average rack power demand) would require ninety square meters of solar panel for each data center rack \u2013 without even factoring in cooling. The resulting size of the solar array would be almost double that of the data center itself.<\/span><\/p>\n<h2><span style=\"font-size: 14pt; font-family: verdana,geneva; color: #339966;\"><b>Old and New Technology<\/b><\/span><\/h2>\n<p><span style=\"font-family: verdana,geneva;\">Research from Microsoft\u2019s Global Foundation Services suggests that data center engineers have begun to explore the possibility of powering a data center entirely by fuel cells built into the server racks. This would result in the power plant being brought inside the data center, and minimize power distribution losses.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">Greater investment in existing technologies \u2013 the likes of hot-aisle\/cold-aisle separation, free-air cooling, chiller-less data centers, decentralized uninterruptible power supplies, greater use of unified computing devices, intelligently power-managed and power-capped servers, ultra-low-power servers, and aggressive dynamic power and space management \u2013 will further improve energy efficiency.<\/span><\/p>\n<h2><span style=\"font-size: 14pt; font-family: verdana,geneva; color: #339966;\"><b>The Technology of Mobile?<\/b><\/span><\/h2>\n<p><span style=\"font-family: verdana,geneva;\">Peter Levine, a general partner at Andreessen Horowitz, has an even more radical proposal. He sees the mobile phone industry as the future hub of energy-efficient technology.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">Mobile\u2019s development of flash memory, smaller CPUs, networking hardware, and components for devices with small form factors has naturally resulted in lightweight processors (such as ARM) and low-cost, low-power elements all round. <a title=\"Data Centers of the Future\" href=\"http:\/\/www.wired.com\/2014\/08\/datacenter-of-the-future\/\" target=\"_blank\" rel=\"nofollow\">Levine predicts<img class=\"extlink-icon\" src=\"https:\/\/www.poweradmin.com\/blog\/wp-content\/plugins\/external-links-nofollow-open-in-new-tab-favicon\/images\/extlink.png\"><\/a> these, as the foundation stones for the next generation: where the data centers powering our cell phones will be remade, using the same technologies that sit inside those phones.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">In this vision, the data center of the future may consist of a set of cheap, cell-phone-like machines \u2013 all connected together with sophisticated software. With the units designed to operate at great temperature variations, these data centers will use much less power and probably less floor space per unit of CPU \u2013 at greatly reduced power and cooling costs.<\/span><\/p>\n<h2><span style=\"font-size: 14pt; font-family: verdana,geneva; color: #339966;\"><b>Look to The Cloud<\/b><\/span><\/h2>\n<p><span style=\"font-family: verdana,geneva;\">As cloud computing becomes more advanced, we\u2019ll likely see a corresponding growth in cloud adoption by data centers. The Emerson survey projects that around 60% of computing will be cloud-based by 2025.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">With more infrastructure hosted in the cloud, the enterprise data center may shrink in size, allowing greater flexibility in data center location. Smaller data centers could be sited in denser urban environments with higher real estate costs. Smart-city and smart-grid solutions could be an offshoot of this, with the possibility of re-using their waste heat. In the suburbs, businesses might deploy modular, pre-fabricated data centers, rather than using up office space.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">The growth of cloud computing also means that data centers will be connecting to more and more external services and applications.<\/span><\/p>\n<h2><span style=\"font-size: 14pt; font-family: verdana,geneva; color: #339966;\"><b>Integrating with Apps<\/b><\/span><\/h2>\n<p><span style=\"font-family: verdana,geneva;\">As high internet bandwidth becomes commonplace both at home and at work, the focus for enterprises will shift to creating new mobile apps and business opportunities. As mobile sales increase, the emphasis will be less on servers and the data centre, and more on building systems that are largely software-enabled.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">The as-a-service model is expected to evolve, with applications being delivered from the cloud. Applied to cloud infrastructure, software-as-a-service (SaaS) will allow companies to try-before-they-buy directly from the cloud, greatly reducing or eliminating traditional development cycles.<\/span><\/p>\n<h2><span style=\"font-size: 14pt; font-family: verdana,geneva; color: #339966;\"><b>New Roles and Responsibilities<\/b><\/span><\/h2>\n<p><span style=\"font-family: verdana,geneva;\">By 2025, data center infrastructure management (DCIM) vendors expect data center management systems to deliver the control required for self-optimization. This paves the way for self-healing, with a level of automation and control that will enable a data center to function without human intervention in the event of sub-system failure.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">Based on current trends, fully automated data centers are a real possibility by 2025.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">In this climate, the role of the <a title=\"Chief Information Officer (CIO)\" href=\"http:\/\/www.computerweekly.com\/feature\/Looking-to-the-cloud-for-the-future-of-datacentres\" target=\"_blank\" rel=\"nofollow\">Chief Information Officer<img class=\"extlink-icon\" src=\"https:\/\/www.poweradmin.com\/blog\/wp-content\/plugins\/external-links-nofollow-open-in-new-tab-favicon\/images\/extlink.png\"><\/a> (CIO) will also change \u2013 with more focus on identifying the strategic needs of a company and developing or specifying whatever IT will enhance products, services or markets. More of a visionary and advisory role. In fact, Gartner predicts that by 2015, about a quarter of all organizations will have a CDO or Chief Digital Officer, to reflect this shift.<\/span><\/p>\n<p><span style=\"font-family: verdana,geneva;\">It seems inevitable that we\u2019re going to want to connect our data centers to more and more external services and applications. Which means that we need to start thinking ahead, to make sure we have the right structures in place, to do so.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Digital, green and global technologies will likely be the three basic drivers of future markets. Both green and global are dependent on digital, so it\u2019s worth considering what the path for digital may look like, in the coming years. The Emerson Network Power survey, \u201cData Center 2025: Exploring the Possibilities\u201d is an industry-wide initiative that [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":3314,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,6],"tags":[],"class_list":["post-3303","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-it","category-tech"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/posts\/3303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/comments?post=3303"}],"version-history":[{"count":5,"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/posts\/3303\/revisions"}],"predecessor-version":[{"id":3738,"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/posts\/3303\/revisions\/3738"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/media\/3314"}],"wp:attachment":[{"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/media?parent=3303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/categories?post=3303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.poweradmin.com\/blog\/wp-json\/wp\/v2\/tags?post=3303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}